The challenge was the steepness of the yard where we wanted to put the bed. On one end the difference from front to back is about 10 -12 inches. But as you can see on this end it is about 20 - 24 inches. That meant that I had to haul in 5 loads of fill before I even started to put in the top soil.
Now it needs some manure and peat moss then covered with about another 6 inches of top soil and it should be ready for planting next spring.
No comments:
Post a Comment